New Arrival - Photos Coming Soon

Drivetrain

Transmission
ClutchMulti-plate with diaphragm spring in oil bath
Gearbox6-speed
Transmission TypeShaft drive (cardan)

Suspension

Front SuspensionTelescopic fork.
Rear SuspensionTwin shocks.
Front Travel5.2 in (132 mm)
Rear Travel3 in (75 mm)

Brakes

Front Braking SystemSingle disc. Optional ABS. Two-piston calliper.
Rear Braking SystemSingle disc. Optional ABS. Two-piston calliper.

Tires

WheelsBlack, Split 5-Spoke with Machined Rim
Front Tire120/70-ZR18
Rear Tire150/60-ZR17

Dimensions

Overall Vehicle Size22.9" w x 30.5" h
Rake / Trail31.1° / 6"
Wheelbase59.1 in (1,501 mm)
Seat Height25.5 in (648 mm)
Ground Clearance3.9 in (100 mm)

Capacities

Hitch TypeRear: Standard
Fuel Capacity4.5 gal (17 L)
Seating Capacity0

Weights

Dry Weight540.1 lbs (245 kg)

Lights & Safety

LightingHigh beam, neutral, low oil pressure, turn signals, engine diagnostics, low fuel warning, low battery, security system (optional)
InstrumentationHandlebar-mounted electronic speedometer with odometer, time-of-day clock, dual tripmeter, low fuel warning light, low oil pressure light, engine diagnostics readout, LED indicator lights
Warranty2 Years, Unlimited Miles

What type of fuel does a 2027 Yamaha TT-R125LE use?

A 2027 Yamaha TT-R125LE uses Gasoline.

What engine does the 2027 Yamaha TT-R125LE have?

The 2027 Yamaha TT-R125LE is equipped with a 124cc 4-stroke I1 engine.

What type of engine does the 2027 Yamaha TT-R125LE have?

The 2027 Yamaha TT-R125LE is equipped with a 4-stroke engine.
$4,324
Pricing Disclaimer

Estimated Payment$77 / mo.
Valley Cycle Center
+
Share
Questions?
Save
Get your trade-in value
What's your trade worth?
Get your trade-in value

Information deemed reliable, but not guaranteed. Interested parties should confirm all data before relying on it to make a purchase decision. All prices and specifications are subject to change without notice. Prices may not include additional fees such as government fees and taxes, title and registration fees, finance charges, dealer document preparation fees, processing fees, and emission testing and compliance charges.